University of North Texas Research Greenhouse-Denton, TX
 

Air conditioning for 2 research cells.

 

 

 

 

 
 
 

Air conditioning for 2 research greenhouse cells.

 

 


 
 

8mm polygal on galvanized steel frame with new ADA sidewalk to aluminum door.

 

 

 

 

 
 

Heating and cooling unit for small corridor between 2 research cells.

 
 

View in small service corridor in middle of greenhouse to allow access to research greenhouse cell on both sides.

 
 

Micro Gro contactor panel for equipment in one cell.

 
 

Micro Gro controls for equipment in one research cell.

 
 

Supply and return air, high pressure sodium lights and aluminum door with aspirated sensor hanging in research cell.

 
 

Interior view of research greenhouse with  fluorescent people lights, high pressure sodium lights, supply air under polygal roof.

 
 

Motorized shade system under polygal roof with high pressure sodium lights and supply air.

 
 

View under ebb and flood bench top showing leveling legs and of main wall post plated and anchored to floor.

 
 

Ebb and flood rolling bench tops with aspirated sensor hanging over bench.

 
 

View under ebb and flood rolling bench tops with water supply tanks for benches.

 
 

Polygal on galvanized steel frame with sidewalk under construction.